Saco designed, delivered and installed the Cargo handling equipment for the DHL HUB Brussels in Belgium.

A large project which started in 2016. The project includes approximately 11,000 m2 Castor decks, more than 30 Motor Powered Roller decks, Truck Docks, hoists and the needed electric controls and PLC System. The client wanted an automated System to transfer ULD’s from Airside to Landside or in the opposite direction. This was a challenge but we managed to design a system that satisfies the customers’ needs. This automated system will speed up the transfer from Airside to Landside considerably.

Very proud to present; here are some images from this project!