Bahrain International Airport completes vital airfield maintenance work

Company Bahrain International Airport
Date 20.05.2022

Bahrain Airport Company (BAC) announced that airfield maintenance work at Bahrain International Airport (BIA) is now complete, Bahrain Airport Company (BAC) announced. Carried out twice annually, the work is vital to maintain civil and airfield ground lighting of the runway, helping to ensure safe and smooth aircraft operations.

BAC Chief Development and Technical Officer Abdulla Janahi said: “Runways and taxiways experience significant wear and tear during normal operations, so maintaining these surfaces without disrupting flights is a key part of any airport operator’s responsibility. Using all necessary resources and adhering to a strict schedule, our Airside and Landside Maintenance and Infrastructure and Building Maintenance teams diligently planned and carried out the work during periods of total runway shutdown. Safety is a top priority at BIA, and we remain committed to delivering a safe, comfortable, and hassle-free airport experience for airlines and passengers.”

The work was completed in line with Civil Aviation Regulations (CAR001) and International Civil Aviation Organization (ICAO) Annex-14. It included rubber removal, friction testing, asphalt patches, shoulder repair, runway strip grading, and leveling, remarking, resealing around Airfield Ground Lighting, weed removal, and signage maintenance.

Contact

Bahrain International Airport
Rd 2404
Muharraq
Bahrain
  • +973 8000 7777