Renovation of Kansai International Airport Terminal 2 Domestic

Company Kansai International Airport
Date 01.08.2025

Kansai Airports is pleased to announce the renovation of Terminal 2 (T2), the domestic area, at Kansai International Airport (KIX) in preparation for future growth in air traffic.

This image is a conceptual rendering. The final design will be developed during the detailed planning phase.

Opened in October 2012, T2 is Japan’s first dedicated terminal for a low-cost carrier, LCC, and is currently utilized for all domestic flights operated by Peach Aviation Limited. The renovation is scheduled to begin in August 2025 and end in spring 2026. It aims to enhance the passenger experience by promoting self-service check-in and expanding the boarding area, enabling a faster and more stress-free airport journey.

Kansai Airports Group will work closely with stakeholders to further enhance the airport’s role as a gateway to the Kansai region.

Overview:
Construction Start: August 2025
Scheduled Opening: Spring 2026 (tentative)
Renovation Area: KIX T2 Domestic
Scope of Renovation:

  • Installation of Self Bag Drop (10 units)
  • Installation of smart security lanes (20 m ×3lanes),
  • Renewal of waiting and commercial areas (the boarding area to be expanded by approx. 20%), etc.

 

 

Contact

Kansai International Airport
1 Senshukukokita
Izumisano-shi
Osaka 549-0001
Japan