ElectroAir in 2025: Best Projects, Milestones & New Solutions
| Company | ElectroAir |
|---|---|
| Date | 16.02.2026 |
2025 was a year of execution at scale – flagship airport infrastructure programs, global logistics performance, and new product platforms supporting cleaner, more resilient ground operations. This annual-style overview highlights the projects delivered and underway, plus key solutions introduced during the year.

Highlights of 2025
The strongest signal of 2025 was the shift from product supply to full infrastructure responsibility: systems engineered as one architecture, power conversion, distribution, underground access, monitoring and on-site commissioning, with predictable performance and long-term serviceability.
Global logistics milestone
In H1 2025, ElectroAir shipped 1,021 items of aviation power and airfield support equipment to 41 countries across four continents, covering GPUs, PIT systems, load banks, chargers, cables and accessories.
Flagship airport infrastructure
Multi-element programs in Poland and Greece proved the “ecosystem” model: underground access + fixed/bridge units + conversion and distribution + operational logic and commissioning.
Portfolio expansion
2025 introduced new solution lines (mobile GPU platform strategy, gas charging systems, marine OPS), plus the EA-BESS initiative to support smarter energy resilience and peak optimization.
Implemented / Delivered Projects
Below are the best examples of 2025 execution quality: complex project scopes delivered under real construction timelines, with engineering ownership and a clear operational outcome – safer, cleaner and more predictable aircraft servicing.
Kastelli International Airport (Crete): full-scope ground power package
Greece’s new Kastelli airport project expanded ElectroAir’s role from PIT supplier to a complete ground power partner, delivering fixed and bridge-mounted GPUs together with engineering, training and commissioning. The result is a unified electrical backbone designed for decades of operation.
Scope of supply
• 29 underground PIT systems (already delivered) • 29 fixed 90 kVA ground power units • 10 bridge-mounted GPUs (EAC-PBB) • Turnkey engineering, training & commissioning
Designed to reduce cable clutter, support APU-off objectives and keep apron operations clean and scalable.

Operational impact
• Cleaner apron and safer routing • Faster turnarounds with fewer failure points • Lower APU reliance (noise + emissions) • Future-ready electrical layout for traffic growth
Why it is a flagship case
ElectroAir proved the “one architecture” approach: PIT + fixed GPUs + bridge units engineered and commissioned as one ecosystem, with long-term maintainability and clear operational metrics.
Additional 2025 Turnkey Deliveries & Market Expansion
In 2025, ElectroAir also delivered multiple turnkey programs beyond the flagship infrastructure projects. These deliveries highlight an important capability: ElectroAir provides not only equipment, but also full on-site installation, commissioning, and training, ensuring a complete operational outcome for airports and MRO facilities.
Humberto Delgado Airport (TAP): Turnkey Ground Power Infrastructure with Full Installation
At Humberto Delgado Airport, ElectroAir delivered a turnkey project for TAP operations that covered both the equipment scope and the full execution on-site. This included installation, commissioning, and training performed by ElectroAir, ensuring the infrastructure is delivered as a complete, ready-to-operate system rather than separate components.
Scope of delivery
• 180 kVA ground power units • 400 Hz PIT systems • Distribution pillars • Underground cables
ElectroAir execution
• Full installation by ElectroAir • Commissioning & operational testing • Training for on-site teams • One accountable partner for end-to-end delivery
Tallinn Airport: Full Infrastructure Improvement for a Greener Direction
In 2025, Tallinn Airport successfully received and implemented a comprehensive infrastructure improvement program aligned with its green operational direction. ElectroAir supplied and integrated multiple system types, combining electric mobile units, bridge-related upgrades, and PIT systems with frequency conversion.
Delivered in 2025
• 7× APA-ECO series (electric mobile GPUs) • 7× under-bridge units replacement • 12× PIT systems with frequency converters • Successfully supplied and integrated in 2025
Outcome
• Supports APU-off operations and cleaner turnarounds • Reduces apron clutter through structured delivery points • Increases reliability via standardized conversion & distribution • Strengthens airport readiness for future electrification
Magnetic MRO Hangar: Fully Equipped as a Turnkey PIT + Frequency Converter Project
In addition to airport apron upgrades, a major MRO hangar facility was fully equipped with ElectroAir infrastructure as a turnkey project, including PIT systems and frequency converters. This approach ensures clean working areas, predictable servicing workflows, and reliable ground power availability for maintenance operations.
Turnkey scope
• ElectroAir PIT systems for under-floor access • Frequency converters for stable 400 Hz power • Designed for long service life and maintenance accessibility
Why it matters
• Clean, organized hangar floor with fewer trip hazards • Faster aircraft servicing and better workflow control • One integrated infrastructure concept for MRO operations
USA Market Development: Multiple Container Shipments Delivered & Successfully Commissioned
2025 also marked strong momentum in the United States. ElectroAir supplied multiple container loads of both battery-driven and diesel-engine-driven GPUs in various capacities, with successful commissioning performed for operational readiness.
What was delivered
• Battery-powered GPUs (various capacities) • Diesel engine-driven GPUs (various capacities) • Container-scale logistics and deployment support
Result
• Equipment successfully commissioned on the U.S. market • Strengthened regional capability and delivery confidence • Foundation for broader partnerships and infrastructure programs
Poland: Wrocław & Rzeszów-Jasionka – infrastructure at full scale
Poland is where ElectroAir’s ground power portfolio becomes true infrastructure: under-apron PIT systems, custom distribution pillars, high-capacity 400 Hz converters and a digital layer that turns power usage into managed operations.
Wrocław Airport: integrated ground power backbone
ElectroAir delivered a cohesive electrical and service backbone for apron modernization, where generation, distribution, point-of-use delivery and traceability operate as one network.
Scope of delivery
• 28 underground hatch PIT systems • 14 EAC solid-state frequency converters (400 Hz) • Custom distribution pillars • Sub-surface cabling linking all service nodes
Digital layer & accountability
• RFID-based access control (authorized activation + logging) • Metering and status data fed to airport AMS • Foundation for predictive maintenance and transparent reporting
Rzeszów-Jasionka (LOT AMS): record-speed hangar PIT delivery
For LOT AMS, ElectroAir completed an under-floor services infrastructure delivery in an extremely compressed timeframe: 13 PIT systems (4 types) delivered in 10 weeks, from design and manufacturing to commissioning.
What it enabled
• Clean, hazard-free hangar workflow • Reliable access to critical utilities through flush hatches • Faster readiness of a high-performance MRO environment
Why it matters
This delivery demonstrates ElectroAir’s ability to execute complex infrastructure under strict milestones without compromising reliability, testing discipline, or commissioning quality.
Related reading
More context on where the industry is moving and how to plan GPU and infrastructure choices in 2026.
Ongoing / In Progress
Alongside delivered infrastructure, ElectroAir invested in next-wave technologies focused on energy resilience and smarter power management, crucial for airports, MROs and operators with peak loads, sustainability targets and grid constraints.
EA-BESS: Battery Energy Storage Solution (with EIS support)
Launched in 2025, EA-BESS is a multi-year initiative focused on battery energy storage systems that can support load balancing, peak optimization and resilience, enabling cleaner operations and more predictable energy control for infrastructure-heavy environments.

New Products & Solutions Introduced in 2025
2025 strengthened the portfolio with practical solutions designed for modern operations: flexible mobile GPU platforms, standardized gas servicing, and clean shore power for ports and vessels. The common denominator is modularity, serviceability and integration readiness.
APA-65 series: diesel, hybrid & electric mobile ground power
The APA-65 platform supports different operational profiles with a standardized design approach, enabling fleet consistency while choosing the right energy model (diesel / hybrid / electric) for each site and policy.

Gas charging systems for aviation ground support
Nitrogen and oxygen servicing is safety-critical. In 2025, ElectroAir expanded its GSE ecosystem with dedicated gas charging solutions designed for repeatable procedures, compliance and operational efficiency, including mobile and fixed concepts depending on site architecture.
Marine shore power (OPS): cleaner ports & quieter berths
Shore power enables vessels to switch off auxiliary engines at berth and connect to the grid, reducing emissions and noise in urban waterfronts. ElectroAir’s OPS portfolio covers the stack: onshore conversion and connection cabinets, plus onboard interfaces, aligned with international standards.
Planning a project in 2026?
Whether you modernize apron infrastructure, upgrade hangar servicing, renew a mobile GPU fleet, or deploy OPS – ElectroAir delivers engineering-driven solutions with commissioning and training support.