Rubb Buildings Ltd ships out to Australia to dismantle relocatable marine storage building from HMAS Choules
A&P Falmouth commissioned a Rubb building for the RFA Largs Bay on behalf of the MoD. This building was completed in October 2011.
The Largs Bay was sold to the Royal Australian Navy (RAN) and was renamed HMAS Choules. She was commissioned in December 2011. Three years later, Team Rubb headed Down Under after being tasked with removing the building from HMAS Choules...
Rubb stepped in to create a compost enclosure for a leading recycling, renewable energy and waste management company after a replacement was required for an existing structure.
Rubb completed demolition of the original structure, which had corroded due to the extreme internal temperature and environment within the In-Vessel Composting facilities. After the site was cleared, the Rubb construction team erected the new multi span tension membrane building upon an existing 3.5m high retaining wall…
|