Airfield / Aeronautical Ground Lighting Installations
Company | Dewhurst Airfield Services Ltd. |
---|---|
Date | 08.05.2015 |
Glasgow Prestwick Airport
- Project: Supply, Installation, Testing & Commissioning of partial replacement of the “13” Approach AGL System
- Client: Glasgow Prestwick Airport Value: £180,000 Contract
- Duration: 3 months
Glasgow Prestwick Airport had a requirement to partially replace the existing “13” approach lighting system. Following…
Jersey Airport
- Project: Supply, Installation, Testing & Commissioning of 400Hz AXA Fixed Ground Power Equipment
- Client: Fitzpatrick Contractors
- Value: £300,000 Contract
- Duration: 2 months
Part of the Jersey Airport North Apron reconstruction was a requirement to install new 400Hz Fixed Ground Power installation…
Blackpool Airport
- Project: Replacement of ‘28’ 3-Bar Approach Lighting Blackpool Airport
- Client: Blackpool Airport Value: £85,000 Contract
- Duration: 10 months
The supply, installation and commissioning of a 3-Bar Approach Lighting Installation at Blackpool Airport. The installation comprised a 3-Bar 50 Light Approach System for…
BAE Warton Aerodrome
- Project: Conversion of disused bungalow to new AGL substation plus new taxiway and stopbar systems
- Client: BAE Systems Ltd – Warton Value: £272,000 Contract
- Duration: 6 months
Additional taxiway edge and stopbar lighting was required for two taxiways south of the…
Cambridge Airport
- Project: Replacement of the Primary AGL Cabling for the 05/23 Runway and Approach Systems
- Client: Marshall Aerospace Cambridge Airport Value: £ 85,000 Contract
- Duration: 3 months
Following the submission of a condition survey of the existing AGL primary cabling by Edward…