Airport Control & Communications Systems Design & Integration

Company FIRSTCo
Date 03.04.2014

HEATHROW TERMINAL 2 – INFORMATION & COMMUNICATIONS TECHNOLOGY – DESIGN MANAGE INTEGRATE

Heathrow Terminal 2 – Firstco's System Consultancy and Project Management bring Airport Infrastructure to Life

The Heathrow Terminal 2 project is a £2.5billion 400,000m² passenger terminal facility that includes a main terminal building, a satellite terminal building, multi-storey car park and cooling station.

Firstco provided Information & Communication Technology (ICT) engineering resources to a Design, Manage & Integrate (DMI) Framework led by Mott Macdonald and appointed by Heathrow Airport Ltd (HAL). Firstco were engaged to develop Client requirements for over 70 systems into a full Scheme Design for delivery by specialist systems providers and complex building integrators. During the delivery stage of the project Firstco were retained to provide a Technical Assurance function by retaining Subject Matter Experts (SME’s) to maintain design continuity and quality through technical responses and design reviews.

Terminal 2 ICT system scope included:

  • Communication Infrastructure
  • Building Controls & Monitoring
  • Security Systems
  • Life Safety Systems
  • Airport Operational Systems

To ensure a successful delivery of the ICT systems Firstco worked within a strict requirements capture process from which they developed comprehensive system performance specifications underpinned by a proactive interface management ethos.

Firstco’s ability to understand and interpret the language of architects, structural, civil, mechanical, electrical, communication and control engineers into a common language understood by all parties was key to the successful determination of the design and its interface requirements.

Firstco have, and will continue to provide, the very best in technical design & assurance services in a wide range of specialist ICT systems used across the airport and other transport sectors.

As John Myers, the Firstco DMI team lead points out, “By adding value throughout the entire project lifecycle, Firstco has remained the ICT partner of choice for HAL and their tier one DMI consultants Mott MacDonald.”

Heathrow Terminal 2 is scheduled to open on 4th June 2014, and Firstco are proud to be a part of the team involved in making it happen.

Contact

FIRSTCo
4 Celbridge Mews
London
UK
W2 6EU
  • +44 2070 340 833