The project: To install pits for a car transporter company in the East Midlands.
Pit Specification: Two 22 metre long pits by 1.0 metre wide. Depth to be stepped , 1.35 metre and 1.65 metre to facilitate work on tractor unit and car transporter at the same time. A link tunnel to connect the two pits. Tunnel to house facility to store waste oil taken from the oil drainers in both pits.
Outcome: Customer has pit system that enables him to work on two full rigs at the same time, giving increased efficiency and reduced costs.