Airport/ATC Tower Systems
| Company | ACAMS Airport Tower Solutions |
|---|---|
| Date | 30.01.2012 |
Namsos Airport
ACAMS was installed in the new control tower at Namsos airport in 2000. The tower cabin has two independant ACAMS EOPS positions. The installed ACAMS-system is fully redundant with dual servers, dual networks and two 18" LCD screens in each position.
ACAMS computers and other technical equiment is installed in two technical rooms: one below the tower cabin, and in the main technical room on the first floor.
Normal traffic operations was not disrupted during the installation process at Namsos.
Specifications:
| Commissioned: | 2000 |
| Operator postions: | 2 single EOPS ( Ergonomical Operator Position ) |
| Operator screens: | 2x 18" LCD wih common brightness control |
| Airfield ligthing control | PAPI, four taxyways, hangar lights. |
| Met display: | 2x Vaisala wind speed directions sensors,1x Vaisala PTU |
| Navaid monitoring: | 2x NDB, 2x ILS, 2x VOR, 2x DME |
| Time synchronisation: | GPS synchronised |
| Tower cabin lighting control: | 13 independently controlled spotlighs – bus based system |
| Sun shade control: | 8 shades with individual contol. |
![]()
Contact
ACAMS AS
Olaf Helsets vei 6
Oslo
Norway
N-0694
Olaf Helsets vei 6
Oslo
Norway
N-0694
- +47 23 13 44 40