Case Study: ULD Handling System for DHL Hub at Leipzig Halle Airport

Company SACO Airport Equipment
Date 14.11.2020
DHL Hub at Leipzig Halle

Airport: Leipzig Halle Airport (LEJ)

System Description:  ULD Handling System

Project Place: Leipzig

Start Date: 2014, June

Project Country: Germany

Commissioning Date: 2017, June

 

Saco’s Scope of Supply:

✓ 10.044 m² Castor Decks

✓ 380 Reload and offload Roller Decks

✓ 270 Weighing Scales, integrated in Roller Decks

✓ 4 Lowering Build-Up / Break Down (BUBD) Work Stations

✓ 1 ULD Truck Dock 20ft

✓ PLC Controls

✓ SCADA System