Participated as members of the ORAT team in the preparation of the handover and opening of the new Larnaca International terminal as Special Systems & Maintenance Specialists (2009).
The Technical Assistance and Consulting services comprised the following:
- Restructure, optimize and redefine the maintenance and technical contracts to meet the expected level of performance and optimize HERMES Airport’s budget.
- Define, structure and propose possible maintenance organizations and provide assistance to HERMES Airports choosing the best-suited solution.
- Ensure set up of storage areas to receive, catalogue, and replenish all spare parts and consumables.
- Ensure set up and equip maintenance areas and Technical Data Center.
- To simulate and monitor technical failures during Terminal operation trials.
- Tender and award outsourced maintenance contracts including Baggage Handling system, Passenger Boarding Bridges, chillers, boilers, lighting, elevators & escalators, fire alarms, sewage and drainage systems.
- Receive, file and/or store all as built drawings, specifications, operations and maintenance manuals, test certificates, systems training documentation, spare parts, guarantees, warranties.
- Set up scheduled preventive maintenance plans for the following systems and equipment in accordance with manufacturers recommendations from the relevant operating and maintenance manuals:
– Baggage systems
– Passenger boarding bridges, VDGS, GPU and PCA
– HVAC
– Lighting
– Electronic equipment (FIDS, BIDS, intercom, bldg fire-alarm system)
– Escalators, elevators and moving walkways,
– Sewage and Drainage systems,
– Car Parking Management System (CPMS)
LARNAKA AIRPORT – DESCRIPTION
- 7,5 Million Passengers per year
- 3,217 passengers per hour in peak periods
- 20 Boarding Gates
- 16 Passengers Boarding Bridges
- 67 Check-in Counters
- 23,210 KVA Electric Power installed
- 6,200 KW Cooling Power installed
- 100,000 m2 Terminal Building
- 9,500 lm Drainage / Sewage Networks
- 1,360 lm of conveyors in BHS
- 5 Bag Claim Carousels
- 2,450 Parking Positions