Lödige Industries completes cargo terminal modernisation for Korean Air at Incheon International Airport

Company Lödige Industries GmbH
Date 26.11.2026
Lödige Industries AGVs at China Eastern Air Logistics cargo terminal

01: An Automated Guided Vehicle (AGV), providing flexible transport capacity and automatically moving ULDs between import and export zones, build-up and breakdown areas, and storage locations. Image rights: Korean Air
Lödige Industries stacker cranes at Finnair's Cool Nordic Cargo Hub

02: One of three fully automated Elevating Transfer Vehicles (ETVs) from Lödige Industries, increasing ULD processing capacity from 18 to 30 units per hour. Image rights: Korean Air
Finnair elevating transfer vehicle at Helsinki Airport

03: Opening ceremony of Korean Air’s modernized cargo terminal at Incheon International Airport. Image rights: Korean Air

Future-ready cargo handling at Incheon International Airport

Korean Air (Korean Air Lines Co., Ltd.) has completed a major modernisation of its cargo terminal at Incheon International Airport in cooperation with Lödige Industries, transforming the facility into a fully integrated “Smart Terminal” with upgraded automated handling infrastructure. The project was completed in September 2026 without interrupting ongoing cargo operations. The modernisation has increased hourly ULD processing capacity from 18 to 30 units, while the terminal’s overall cargo handling capacity is expected to increase by more than 25 per cent.

Originally commissioned 25 years ago, the facility has been upgraded while remaining fully operational. This was a complex retrofit requiring meticulous planning and phased execution. Lödige Industries was selected for its expertise in complex retrofits and its ability to integrate advanced automation into legacy infrastructure while maintaining throughput during the transition.

“To manage increasing cargo volumes while consistently delivering high service quality, we are actively advancing modernisation and automation,” said JD Eum, Executive Vice President and Head of Cargo Business Division at Korean Air. “This renovation is an essential step to proactively respond to the rapidly changing global logistics environment by upgrading equipment and integrating smart technologies. Our cooperation with Lödige Industries throughout the project enabled us to impl,ement the modernisation step by step while maintaining the terminal operations.”

The upgrade was rolled out over several carefully orchestrated phases to avoid disruption to cargo handling capacity. The new systems incorporated enhanced workplace safety standards and further improved working conditions for employees. An early stage of the modernisation included the installation of a key bypass lane and extensive conveyor systems within the cool storage area, creating alternative cargo routes for subsequent works. Existing handling equipment was then progressively replaced with new automated systems.

At the core of the upgraded system are three fully automated Elevating Transfer Vehicles (ETVs) from Lödige Industries, supporting the increased ULD processing capacity of 30 units per hour, compared with 18 units previously. Two Automated Guided Vehicles (AGVs) add flexible transport capacity, automatically moving ULDs between import and export zones, build-up and breakdown areas, and storage locations.

“Projects of this scale depend on close coordination, particularly when modernisation must take place without interrupting daily cargo operations,” said Nicholas Tripptree, Managing Director for Asia-Pacific at Lödige Industries. “The successful completion of this project reflects the strong partnership and trust between Korean Air and Lödige Industries. Together, we navigated the complexities of upgrading an existing facility. We value Korean Air’s continued trust and look forward to supporting the system’s long-term performance.”

In addition to the ETVs and AGVs, the comprehensive modernisation also includes truck docks, decks and extensive conveyor systems. The upgrade included Lödige’s Cargo Professional Suite, the company’s self-developed central terminal management system for air cargo operations. Together, these elements form an integrated infrastructure designed to streamline cargo flow and maximise terminal efficiency.

Following the successful handover in September, Korean Air officially marked the completion of the project with a ceremony on 20 October 2026, at which Nicholas Tripptree represented Lödige. During the ceremony, Korean Air presented Lödige Industries with a Plaque of Appreciation, recognising the company’s expertise and dedication throughout the cargo terminal renovation project. The recognition highlighted Lödige’s contribution to implementing advanced logistics automation systems within a complex operational environment.

Looking ahead, Lödige Industries remains committed to advancing air cargo automation and supporting the evolving needs of cargo operators worldwide.

 

About Lödige Industries

Headquartered in Paderborn, Germany, Lödige Industries is the world market leader for air cargo terminals and automated parking systems and a leading provider of logistics systems for warehouses and industry as well as lift solutions. Founded in 1948, the family-owned company delivers complex material handling systems, from planning, design, programming and commissioning through to service. In 2025, Lödige Industries generated revenue of €246 million. The company employs around 1,500 people.

 

 

 

 

Contact

Loedige Industries GmbH
Wilhelm-Loedige-Str. 1
34414 Warburg
Germany
  • +49 5642 702-0