Air New Zealand
Airport: Auckland Airport (AKL)
System Description:ULD Handling and Storage System, Fully Automated
Project Place: Auckland
Start Date: 2015, June
Project Country: New Zealand
Commissioning Date: 2016, July
Saco’s Scope of Supply:
✓ ETV (4-level 15ft) with full-automatic controls
✓ 270 Storage Positions 10ft
✓ 15 Motor Powered Roller Decks 10ft
✓ Turntable with Right Angle Deck
✓ Truck Dock 10ft with Powered Roller deck
✓ Truck Dock 20ft with Powered Omni-Deck
✓ Dolly Dock 10ft with Powered Roller deck
✓ 3 lowering workstations for 10ft ULD’s
✓ High and Low Level Control System with:
– Overall PLC controls
– ETV remote control, inventory control, interfacing with
client IT Systems, database for operations and errors,
VPN Remote maintenance support
✓ Delivery, installation, commissioning, training |