Total Airport Solutions

Company Systems Interface Limited
Date 29.06.2011

Systems Interface has completed Phase 1 of the London Southend Airport project for Stobart Group with the opening of the new ATC Control Tower.

A major part of the multi-million pound regeneration scheme at London Southend Airport, the new Control Tower has been equipped with state of the art specialist avionics systems designed, installed and commissioned by Systems Interface.
The transition from the old to new Control Tower has been seamless and highlighted the exemplary planning, project management, and technical skills of Systems Interface.

Mr Terry Smith of the Safety Regulation Group stated in his report: “I am impressed with the quality of the installations (including cable management) within a short timescale since last visiting the NCTB as an empty shell. There has clearly been a huge amount of quality work undertaken”.

Systems Interface would like to thank its team of sub-contractors who have helped to bring the project to a successful conclusion – on time and in budget.

The company is now concentrating on Phase 2 of this project which involves the supply of various Navaids, including two ILS systems, a DME and two IRVR systems together with a complete replacement of all Airfield Ground Lighting.

This multi-million pound development scheme will not only see the upgrade of the complete Air Traffic Control Facilities by Systems Interface, but also the construction of a new terminal, a hotel and a £12 million railway station on the airport’s eastern boundary providing regular services into London Liverpool Street Station.

About Systems Interface
A leading project based aviation systems integrator with many years specialist experience delivering turnkey projects to civil and defence airports and Civil Aviation Authorities worldwide.

Systems Interface manages complex logistical and technical requirements, sourcing and supplying fully integrated bespoke ATC systems, navigational aids and airfield lighting designed, installed and commissioned to exacting requirements.

Services include system design, upgrading existing Air Traffic Control Systems, completely new turnkey installations, safety cases, training and maintenance and civil works. A dynamic project based organisation with a proven track record for delivering complex projects on time and in budget.

Systems Interface – Total Airport Solutions
www.systemsinterfaceltd.com

Contact

Systems Interface Limited
Unit 9c, Oakhanger Business Park
Oakhanger
Bordon
Hampshire
United Kingdom
GU35 9JA
  • +44 (0) 1483 267 066