Port Polska advances design of new airport’s air traffic control tower

The design of the Air Traffic Control Tower (ATCT) at Poland’s new Port Polska airport is taking shape, with JSK Architekci appointed to prepare the design documentation under a contract worth more than PLN 15 million.
The tower will be a key operational facility at the airport, positioned centrally between the runways and aligned with the passenger terminal. Its location and design are intended to provide air traffic controllers with an unobstructed 360-degree view of the airport.
The facility will accommodate both air traffic control teams and personnel responsible for managing aircraft and vehicle movements on the airport apron.
The tower design contract forms part of a wider programme of 18 executive contracts covering design documentation for 36 supporting airport facilities. These include maintenance bases, cargo terminals, an airport police building and an airport fire station.
Tower design and facilities
The proposed structure will comprise three main elements: an operational cab housing the control facilities, a reinforced-concrete shaft serving technical and circulation functions, and a two-storey podium containing administrative and technical facilities.
Its central position between the runways, on the axis of the passenger terminal, is intended to support visibility across the airport and the effective management of aircraft movements both in the air and on the ground.
Port Polska airport development
Port Polska is a strategic transport investment programme involving the development of a new airport between Warsaw and Łódź, alongside a high-speed rail network and improved road connections.
The airport is initially planned to handle between 34 million and 44 million passengers annually, with provision for expansion in line with future demand.
